Energy Efficient Technologies worked with Crescent Crown to reduce energy usage and Scope 2 Carbon Footprint in all of their locations in all machines.
In all EET deployed CryoGenX4 in 141 Large Rooftop DX HVAC and refrigeration systems comprising a total of 2728 Tons of equipment.
A detailed year over year evaluation was completed on the electric bills and showed an overall electric bill reduction of 14.25%.
These results by location are shown below in New Orleans, Baton Rouge, Lafayette, Mesa and Surprise.

Courtyard by Marriott: EET Deployed and validated savings on all equipment at this Crystal City VA location. Performance Results from the Demo The average key performance indicators (KPI’s) measured...
Army- Night Vision Electronic Sensors & Directorate Night Vision Electronic Sensors & Directorate located at Fort Belvoir was interested in becoming more energy efficient, but wasn’t sure of the best...
Helping Those Who Do Good, Do Better Glen Mar Church is located in Ellicott City, Maryland and also operates a pre-k school. Working with a tight budget, the church and school needed to increase...
Energy Efficient Technologies
400 East Pratt Street, Suite 800
Baltimore, MD 21202
800-344-8132 (Office)