After the HVAC energy conservation measure savings and improvements were validated with an investment grade kWh meter, CellularOne deployed this ECM, now in its 4th generation, called CryoGenX4, in every one of the hundreds of cell towers they own and operate.
This case study details the results of the completed comprehensive energy performance study conducted at one of the CellularOne cell tower shelters located nearest to their headquarters in Show Low, AZ.
Running from August 21 to October 5, 2015, the pilot was designed to illustrate the positive impact the energy control measure -- referred to as the “ECM” -- would have on the performance of the wall-mounted cell tower shelter air conditioning system.
As shown in this field demonstration, the ECM restores the capacity of cooling systems lost over time due to fouling of the heat exchange surfaces.
-Restore capacity of the cooling systems to better satisfy fluctuating shelter loads
-Produce additional cooling system redundancy at no extra cost or interruption to operations
-Improve cooling system efficiency, lowering cost to produce each ton of cooling required
-Restore thermal efficiency, allowing cooling systems to achieve thermostat set points faster and shut off sooner
-Improve cooling system performance, reducing runtime and extending equipment life by 20% or more
-Reduce amp draw, kW and overall kWh consumption
-Reduce operating system pressures in compressors, reducing unscheduled service calls
The location chosen for this field demonstration is a standard cell tower shelter supported by two nominal 3-ton wall-mounted cooling systems operating in a redundant fashion. The systems are rotated bi-monthly, so runtime on each is balanced out over time. The primary cooling system is normally set to 73 degrees as it was for the pilot, while the back-up cooling system is set for 78 degrees. It only operates when the shelter load gets so heavy that the single cooling system can no longer keep up or it malfunctions. Only the primary unit was operated for this demonstration.
When comparing the pilot cell tower cooling system before and four weeks after the ECM was installed, below are some of the highlights of the field demonstration:
This means that for every ton of cooling the pilot system is asked to produce, CellularOne is spending 25.4% less money to do so.
Grant’s IGA Supermarkets, West Virginia, Virginia Helping a family owned and operated grocery store: Grant’s Supermarket in Appalachian West Virginia and Virginia has been family-owned and operated...
Cogent Communications, Somerville, MA Overall cooling and energy performance in a data center is crucial. Without the proper temperature, systems can overheat and fail, causing major disruptions and...
In Logan Township, NJ, Dr. Schar owns and operates a 50,000 sq. ft. industrial bakery that requires large quantities of energy to precisely control the mixing, rising, baking and freezing of its...