Tojo Mushroom was looking to save costs and reduce their carbon footprint.
Energy Efficient Technologies performed a detailed energy audit, made numerous recommendations for improvements.
The purpose of this case study is to provide the results of the savings validation pilot of an HVAC and refrigeration ECM now known as CryoGenX4 at the largest mushroom growing facility in the US
Operation of the Mushroom House
Each HVAC unit used for conditioning the mushroom house operates on a unique schedule of set points, percentage of outside air, backup A/C, and heat at 100% while A/C is on. This schedule is important as the operation of the equipment affect the results of the test.
Data Analysis
The data was analyzed by gathering the operation schedule of each unit and categorizing similar settings of set point, outside air percentage, and outside temperature. Using multiple similar days the percentage of savings before and after were created and averaged to present a final value.
Other Food Manufacturing Case Studies:
Grant’s IGA Supermarkets, West Virginia, Virginia Helping a family owned and operated grocery store: Grant’s Supermarket in Appalachian West Virginia and Virginia has been family-owned and operated...
Cogent Communications, Somerville, MA Overall cooling and energy performance in a data center is crucial. Without the proper temperature, systems can overheat and fail, causing major disruptions and...
In Logan Township, NJ, Dr. Schar owns and operates a 50,000 sq. ft. industrial bakery that requires large quantities of energy to precisely control the mixing, rising, baking and freezing of its...