Vodacom Cell Towers

2019-2020  The manufacturer of CryoGenX4 validated in Cell Phone tower HVAC systems in South Africa.

22.7% improvement in the Delta-T 

9.9% reduction in kWh’s consumed during this demonstration,

Vodacom will be able to reduce the AC load in their ~12,500 cell tower huts across the country by 10%.

Related Case Studies

CellularOne- Arizona

Overall cooling and energy performance in a data center is crucial. Without the proper temperature, systems can overheat and fail, causing major disruptions and the possibility of losing data. Energy...

Marriot Residence Inn Miami

Marriott Residence Inn Miami Airport Detailed baseline and post measurements were taken of six (6) nominal 10-ton, 4-yr old AAON Roof Top Heat Pump Units (RTUs) serving the hotel. The primary purpose...

Courtyard by Marriott

Courtyard by Marriott: EET Deployed and validated savings on all equipment at this Crystal City VA location. Performance Results from the Demo The average key performance indicators (KPI’s) measured...

EET Logo

Energy Efficient Technologies
400 East Pratt Street, Suite 800
Baltimore, MD 21202

800-344-8132 (Office)

Connect On Social