Vodacom Cell Towers

2019-2020  The manufacturer of CryoGenX4 validated in Cell Phone tower HVAC systems in South Africa.

22.7% improvement in the Delta-T 

9.9% reduction in kWh’s consumed during this demonstration,

Vodacom will be able to reduce the AC load in their ~12,500 cell tower huts across the country by 10%.

Related Case Studies

FNB Bank

Energy Efficient Technologies performed energy audits and then performed LED upgrades and CryoGenX4 deployments in all equipment in all locations locations throughout West Virginia. Reduced Overall...

Baltimore Aircoil Maryland

Saving in Manufacturing This facility is one of the largest HVAC equipment manufacturers in the world. This location in Baltimore was looking to reduce cost and get better, safer lighting in 2016....

Dollar Bank Data Center

Energy Efficient Technologies(EET) installed approximately 95 sensors as part of an ASHRAE Level III audit to identify how to save energy and reduce costs in Dollar Bank data center while improving...

EET Logo

Energy Efficient Technologies
400 East Pratt Street, Suite 800
Baltimore, MD 21202

800-344-8132 (Office)

Connect On Social